NoticiasMarseille prepares for the 60th SNIM with Justine Mettraux
From April 3 to 6, 2026, the southern harbor of Marseille will implement a dedicated port operations plan to host over 100 IRC crews: berthing assignments will concentrate IRC 0–1 in berths A1–A6, IRC 2–3 in berths B1–B8, and one-design lines (including the J70 fleet) at the outer quays; temporary moorings and med-moor arrangements will be installed in the basin, two lifting cranes will be on standby for technical assistance, and race committee boats plus spectator craft will follow a prescribed traffic separation scheme to minimize interference with commercial traffic into the Vieux-Port.