93m Feadship Lady S Nears Delivery Date: Inside the Ultra-Luxury 305-Foot Superyacht

Book a private on-board tour now to secure the final selection of cabins and to evaluate the unprecedented amenities before delivery. The 93m Feadship Lady S is approaching handover, with a 305-foot footprint that blends terraces with intimate social zones. They structured the layout to connect the north wing with the main areas, creating royal privacy and seamless transitions from exterior decks to interior lounges, which will resonate in every guest experience.

The interior concept, led by franchini, weaves a callisto-inspired celestial motif through lounges, owner suites, and guest cabins. gran terraces extend the living spaces to the outdoors, while warm materials and tailored fabrics define the ambiance. The royal tone appears in understated gold accents and bespoke upholstery across all areas, ensuring consistency from the skylounge to the meditative corners.

For guests pursuing international turismo, the Lady S delivers a curated experience. The design allocates zones for dining, spa, cinema, and fitness, with modular lounges that reconfigure for intimate gatherings or grand receptions. A carefully planned circulation ensures that the north-facing terraces remain breezy and private, even when service activity peaks in the wing and adjoining cabins areas. they adjust lighting and seating to preserve privacy during peak times.

The project manager coordinates the final stages across the crew and supplier network. They monitor the estimated delivery window and run safety and reliability checks on propulsion, stabilization, and entertainment systems. The unprecedented integration of automation simplifies crew workflows, while the Callisto-driven aesthetic informs lighting scenes and color temperature for day-to-night transitions.

From an owner’s perspective, Lady S stands out: extensive terraces, a dedicated owner wing, and a suite of amenities designed for long-range itineraries. The cabins offer generous space, with flexible layouts that can be tailored to individual needs. If you are evaluating options for a private charter or a bespoke ownership, request a detailed briefing to review port calls, across different states and international routes, and the most desirable itineraries in high-demand locales.

Delivery milestones and design highlights for Lady S as delivery approaches

Review the latest photo from moricca and brunobuisson to verify the approaching delivery window and align the blog with vesselbrand specifics.

Delivery milestones include: reported progress on the landing and walkway; hull and superstructure are entirely complete; exterior coatings are near final cure; the interior fit-out comprises a kitchen hub and a separate guest zone; bathrooms are arranged as private en-suites across multiple cabins; commissioning and testing run in parallel across utilities. States from the yard confirm milestones ahead of schedule, with sea trials scheduled as the next major checkpoint.

There is a dedicated bathroom module near the crew lounge, signaling the precision of the fit-out and the balance between private and service areas.

Design highlights include a distinctive silhouette with turismo-inspired detailing; the turismo language informs detailing across decks. Brunobuisson shapes the exterior brow and sculpted edges; vesselbrand guidelines drive the material mix of warm veneers, marble-look surfaces, and brushed metals for a cohesive luxury feel. There, a walkway links the owner’s deck to the bridge, while a separate guest corridor enhances flow. The kitchen anchors the main social deck with a generous island and integrated appliances; bathrooms throughout the layout emphasize private en-suites with premium fixtures and smart controls.

Such expectations require proactive engagement: request a focused photo update highlighting the kitchen, bathrooms, and landing areas. The blog will track delivered milestones as Lady S moves toward handover, with faith in the yard’s schedule and a clear view of finishes and systems. Readers can expect multiple angles from moricca and photo sets, plus briefs that state the vesselbrand benchmarks and Brunobuisson’s design intents.

Final sea trials: tests, timelines, and what observers will document

Document hull and main propulsion behavior within the first hour of sea trials, recording data per meter and noting performance in each area: hull, main deck, kitchen, and gallery.

Set a clear timeline: tests run sequentially–power delivery, propulsion response, steering torque–with predefined windows for each. A dedicated observation post on the bow captures wave impact, and observers record note times, positions, and any deviations from expected curves. The plan does include contingency windows for weather delays.

Observers will document live images that tell a story: images from the gallery, video clips for the theater of operation, and annotations on liveability of interior spaces under spray. They note drizzle, wind vectors, and spray from jets near the bow, with wide spray patterns and calm water reflections.

Materials checks include coatings, fastening integrity, and full-height door operations; if access is limited, they record the condition with tagged photos from every vantage.

Positioned measurements cover hull strain, structural response, and main propulsion alignment; they verify that sensors in critical zones report consistent data with engine-room metrics and the response of control surfaces. This approach does not rely on a single reading; it collects multiple samples.

franchini and Washington teams join the gruppo of Columbus yard engineers to validate the subject of windage, trim, and heel. Observers compare the main power response with simulations, and they check that sensors in the kitchen and living areas match instrument logs.

Live notes capture turismo aspects: cabin comfort, noise, air flow, and access for guests. The observers collect images of the salmon-colored hull on calm water, drizzle in spray, and jets streaming past the bow. The gallery will host a timeline of photos and meter-based graphs, with owners y parents reviewing data later with their gran. The client owns the data.

The data package ends with a concise report for the sea trial file: hull and main systems, areas tested, measurement metadata, and a cross-reference to the delivery schedule. Observers will present the final notes to the crew to align the next steps and the target delivery milestones.

Cabin layout and luxury finishes: latest selections and approval steps

Recommendation: follow a two-deck cabin layout anchored to the owner’s suite and guest accommodations, and follow a broker‑led approval cadence to ensure this process locks decisions before fabrication begins, with only essential changes allowed later.

Configurations, including a private master terrace and other terraces, maximize exterior living while preserving service lines. Position the master on the main deck with a full-height head and a study; guest cabins on the lower deck with en-suite heads; crew facilities aft to preserve quiet for guests. The two-deck approach keeps access clean for jets, theater seating, and engineering spaces, aligning with palumbo standards.

Finishes focus on materials that endure at sea while delivering tactile luxury. The interior follows palumbo engineering standards, using such materials as light oak with matte graphite accents, walls in fabric and leather textures, and stone in bathrooms. Farzan hardware is specified for hinges, latches, and hydrotherapy jets in spa showers. The alloy components use aluminum-built frames to reduce weight and permit broader window surfaces for daylight, with vesselbrand fixtures throughout, and amenities coordinated with the project timeline.

Moon glow lighting with LEDs is used along corridors and in sleeping cabins for a calm night atmosphere. Terraces look like outdoor lounges with weatherproof fabrics and planters that align with the palette, such that other zones stay connected via discreet service corridors. The theater room features tiered seating and acoustic panels from experienced suppliers, tuned to deliver clarity without fatigue.

Approval steps: Step 1 – design review with the broker and owner; Step 2 – submit material samples and finish boards for review; Step 3 – engineering sign-off for the aluminum-built structure and load paths; Step 4 – construct a full-scale mock-up cabin or joinery module to verify configurations including terraces and theater seating; Step 5 – confirm supply chain timing with vesselbrand partners and ensure lead times align with awaiting delivery; Step 6 – issue final production authorization to palumbo and the yard, aligned with the project timeline.

Propulsion system and stabilizers: commissioning steps before handover

Implement a four–stage commissioning plan in the shipyard that covers mechanical, electrical, control, and sea-trial validation, with clear acceptance criteria aligned to the specifications and the owners’ expectations. The plan should be documented in the purchase package and tracked against time estimates to avoid delays, ensuring the full-height and complete system readiness before handover.

Begin with pre-commissioning in the shipyard, focusing on the propulsion gear supplied by tagliavini and the stabilizer actuators. Verify lubricant levels, seals, and cooling circuits, then perform dry-dock checks on shafts, propellers, and rudders. Validate that all components incorporate the required features and that fitments match the 93m Lady S design between the hull and appendages. Capture measurements in meters and log any deviations for the owners and yard teams to review, avoiding questions that remain unresolved at transfer time.

Proceed to mechanical and electrical integration with a vertical alignment approach for the propulsion train. Align propeller shafts, bearings, and couplings to within the indicated tolerances, using laser or dial indicators, then check the between-shaft runout and torsional stiffness. Confirm that the stabilizers’ full-height fins deploy and retract smoothly, with no binding, and that the stabilizer monitoring system reports stable readings during simulated maneuvers. Account for wide operating envelopes–slow-speed docking, high-speed transits, and extreme trim conditions–to ensure stability remains within the planned envelope.

Activate the control systems and propulsion interfaces, separating redundant power feeds and establishing robust interlocks. Test the control logic for propulsion direction, reverse torque, and speed ramping, and ensure the system correctly responds to commands in both manual and autopilot modes. Validate the interface with the gyro, navigation, and stability calculations, including fault-tolerant pathways for ROMEO and other safety suites. Document all settings, and keep a running log of estimated commissioning time, voltage levels, and current draws.

Conclude with sea trials and acceptance checks, validating thrust, propulsive efficiency, vibration thresholds, acoustic signatures, and stabilizer effectiveness under loaded and ballast states. Reconcile results with the ship’s specifications and the ForBest practices referenced by Forbes contributors, and confirm that all readouts meet the predefined criteria before the formal handover.

Step Responsible Key Checks Duration Acceptance Criteria
Pre-commissioning in shipyard Owners, shipyard technicians, tagliavini reps Lubricants, seals, cooling, shaft and rudder fits, stabilizer actuators, separate power feeds 3–5 days All components installed per specifications; no leaks; measurements logged; no anomalies
Mechanical alignment Engineering team Vertical/horizontal alignment, runout between shafts, torsional stiffness, bearing preload 2–3 days Within tolerance; stable alignment under load; documented corrections
Electrical and control integration electricians, systems integrators CANbus/ethernet networks, interlocks, control sequences, fault paths 2–4 days Controls respond correctly; red/green status indicators accurate; redundancy verified
Mechanical function tests engineers, technicians Propulsion starts/stops, direction changes, vibration monitoring, stability fin actuations 1–2 days No abnormal vibrations; stabilizers deploy/retract smoothly; readings within limits
Sea trials and stability checks owners, captain, classification reps RPM mapping, acceleration, deceleration, trim, ballast effects, stability criteria 2–4 days Propulsive performance matches specifications; stability within predefined margins; data logged

Crew readiness: training schedule, on-site drills, and shift planning

Implement a six-week rolling training cycle that time boxes theory, safety, and practical drills, with two weekly on-site sessions and one separate shift for refreshers. Structure modules around distinctive engineering, hospitality, navigation, and safety features, each with explicit assessment points. Appoint a named head of training to coordinate sessions and maintain a single, auditable record throughout the cycle.

On-site drills run in two-deck zones and cover bridge procedures, engine room readiness, galley operations, and safety evacuations. Include drizzle as a test condition to verify recall under light weather and ensure performance holds under pressure. Use a dedicated checklist for each module and ensure courtesy remains at the forefront during every handover and debrief.

Shift planning splits the crew into separate blocks: day, evening, and night, with fixed handover times to prevent fatigue. Build an international roster that matches workload across the yacht’s length and voyage patterns. Provide headroom for rest periods and quick breaks, and design transitions to preserve courtesy and continuity across teams.

Training materials incorporate aluminium gear, branded PPE, and interactive simulations that mirror the game of yacht operations. Track progress with points earned on tasks and theory quizzes, and keep a separate log for all drills. Use romeo scenarios to test real-time decision-making and ensure staff can operate autonomously throughout a voyage. In facility planning, align the two-deck zones with terraces and other features to support seamless shift changes and sustained performance.

Close the cycle with a cross-functional review spanning engineering, hospitality, and safety, adapting the training menu to match the yacht’s features and length. Align refreshers with international itineraries and report against Forbes-style benchmarks to drive continuous improvement throughout the crew’s development and the vessel’s operational readiness.

Delivery day sequence: handover, documentation, and client onboarding logistics

Delivery day sequence: handover, documentation, and client onboarding logistics

Confirm the delivery window with the client and appoint a single point of contact who oversees the entire process.

  1. Pre-delivery coordination and condition checks

Start with a concise pre-delivery briefing that aligns the yard, interior teams, and the client. For a yacht of this scale, such as a 93m platform, verify the exterior condition and interior readiness across all decks. Coordinate with the brands Rondal for hard fittings, Antonini for interior hardware, and Moricca for bespoke furniture to confirm that every element matches the latest specifications. Document the current status of all systems, including propulsion, navigation, and entertaining spaces, and flag items awaiting completion. Establish the estimated completion date for any outstanding items and lock in the first milestone on the delivery calendar.

  1. Handover execution: walkthrough, systems, and amenities

During the handover, conduct a rigorous, step-by-step walkthrough that mirrors the client’s anticipated experience. Begin with the exterior and then move to interior highlights–such as the master suites, guest suites, and crew areas–while confirming features and layouts meet the contract. For a yacht of this length, plan a comprehensive tour that includes the inboard machinery room, electrical panels, and the entertainment systems in the saloon and bridge deck. Confirm the presence and condition of the helipad (if equipped) and ensure access points, safety equipment, and life-saving gear are compliant. Use a standardized checklist to verify that the interior finishings, fabrics, coatings, and hardware–from rondal railings to Antonini fittings–align with the approved designs. Note any deviations and secure a formal notice for remediation, then schedule completion windows for any outstanding items in January or the next practical period.

  1. Documentation package and compliance

Prepare a comprehensive documentation package that the client can review on day one and reference throughout the ownership. Include the bill of sale, certificates of seaworthiness, classification society papers, MTU/engine logs, navigation and bridge equipment manuals, and maintenance schedules. Compile warranties, spare parts lists, and service contracts for brands like Oceanco references, plus interior suppliers such as Moricca and Antonini, ensuring all serial numbers and model designations are correct. Create a clear inventory of equipment located in the yard or on board, with locations noted (inboard, aft, foredeck, etc.). Provide a portable digital folder and a printed binder, both organized by system and by room, to facilitate quick consultation during early operation and onboarding. Include any requirementspaolo items–if specific client or regulatory requirements exist, document them explicitly and attach the corresponding approvals. Mark items that are awaiting final signatures and set expected turnaround times to avoid delays in the client’s decision-making process.

  1. Client onboarding logistics: team introductions and access provisioning

Initiate client onboarding with a structured program that accelerates comfort and confidence. Introduce the owner’s team to the captain, chief engineer, and head of interior operations, then present the onboard crew, including department heads for hospitality, engineering, and IT. Build an onboarding itinerary that covers operational protocols, safety procedures, and daily routines on such an unprecedented vessel. Provide an overview of the project timeline, including how the first week will roll out across tours, provisioning, and system familiarization. Confirm IT and communications access: satellite phones, Wi‑Fi distribution, and secure guest networks, along with SIMs, e‑SIMs, and user profiles for the client and key staff. Prepare a welcome kit that highlights the yacht’s brands, interior features, and entertainment options so the client can begin personalizing settings, like preferred lighting scenes and music playlists, from day one. Include a dedicated contact list with direct lines to the captain, project manager, and the assistant for ongoing queries and changes.

  1. Continuation and post-delivery wrap-up

Set a defined continuation plan that transitions from handover to steady-state operation. Schedule follow-up calls and on-site checks to validate system performance after the client has first settled in. Use a brief, solution-focused cadence to address any remaining items, such as minor interior adjustments, hardware recalibrations, or schedule updates for servicing and provisioning. Maintain a transparent log of all notices issued and resolved, with dates and responsible teams identified. Keep the client informed about forthcoming events, including routine maintenance windows and upcoming project milestones tied to the yacht’s interior and exterior evolution. Ensure the long-term partner network–ranging from the yard to the brands and the travel and turismo teams–remains aligned with the client’s expectations and the vessel’s operational tempo.