GetBoat.com
Rent a BoatDestinationsExperiencesList Your Boat
Get a Free QuoteLog In
All ArticlesZprávyTipy na cestováníCestovní inspiraceTrendy v jachtinguPříběhy a zážitkyObchodní cestování
GetBoat.com
Rent a BoatDestinationsExperiencesList Your Boat
Get a Free QuoteLog In
All ArticlesNewsTravel TipsTravel InspirationTrendsStoriesBusiness Travel
GetBoat.com

The world's largest marketplace for boat rentals, yacht charters, and water experiences. Trusted by over 500,000 boaters worldwide.

Explore

  • Blog
  • Tipy na cestování
  • Cestovní inspirace
  • Trendy v jachtingu
  • Editorial Policy

Categories

  • Zprávy
  • Příběhy a zážitky
  • Obchodní cestování
  • Jachtové výstavy
  • ICON jachty

Company

  • Browse Boats
  • Buy a Boat
  • List Your Boat
  • Help & FAQ

© 2026 GetBoat.com — All rights reserved.

Editorial PolicyHelp
O'Day 40: Design, Performance and Ownership Guide
Zprávy

O'Day 40: Design, Performance and Ownership Guide

With an LOA of 39'7", a beam of 12'7" and masthead rig standing roughly 51'6" above the deck, the O’Day 40 requires careful berth planning: marinas must offer sufficient LOA and mast clearance, channel depths must accommodate either the 6'8" fin keel or the 4'11" wing keel, and haul-out logistics demand crane capacity for a near 18,000 lb displacement hull.

5 min·17. 3.
Delos 2.0 Nears Completion as Hull Is Closed Up
Zprávy

Delos 2.0 Nears Completion as Hull Is Closed Up

← PředchozíStránka 4 z 260Další →

All salon windows and deck hatches are fitted and sealed, leaving only the hull port lights to be installed before Delos 2.0 is considered fully closed up; completing these cabin windows is the final structural step prior to extended sea trials and system commissioning.

5 min·17. 3.
Fiberglass Boat Restoration: Key Steps and Products
Zprávy

Fiberglass Boat Restoration: Key Steps and Products

Transporting polyester resins, acetone, and gelcoat for hull repair is treated as moving hazardous goods by many freight and courier services, so carriers commonly require proper labeling, limited container sizes, and documentation to comply with maritime and road safety rules; plan shipments and shore-based storage to avoid delays before a refit project begins.

6 min·17. 3.
Keep Your Boat Quiet Without Breaking the Bank
Zprávy

Keep Your Boat Quiet Without Breaking the Bank

At cruising speeds of 18–25 knots, a typical 40–50 ft powerboat will often register 80–95 dB at the helm, which can interfere with speech, on-deck activities, and guest comfort unless mitigated through targeted sealing and isolation measures.

5 min·17. 3.
The Growing Market for Ice-Class Megayachts
Zprávy

The Growing Market for Ice-Class Megayachts

Polar Class 7-rated megayachts routinely demand reinforced hull plating, heated sea chests, and fuel reserves that support ranges beyond 4,000 nautical miles, enabling transoceanic logistics and extended off-grid operations in ice-prone corridors.

5 min·17. 3.
Sausalito–Tiburon Sailing4Parkinsons Schedule and Highlights
Zprávy

Sausalito–Tiburon Sailing4Parkinsons Schedule and Highlights

On April 11–12, 2026 the regatta itinerary concentrates operations between Sausalito and Tiburon: a 1:45 PM Matthew Turner cruise departs from the Bay Model Visitor Center in Sausalito on April 11, followed by a 6:00 PM "Fête de la Baie" gala at the Corinthian Yacht Club, Tiburon, and a 12:30 PM race start from the Corinthian Yacht Club on April 12 culminating in a post-race celebration.

5 min·17. 3.
New Offshore Passage from St. Barths to Newport
Zprávy

New Offshore Passage from St. Barths to Newport

On May 9, 2026 a 1,500‑nautical‑mile offshore course will depart Gustavia, Saint Barthélemy, and terminate at Fort Adams in Newport, Rhode Island, running northward as Caribbean regattas conclude and the Atlantic season begins.

6 min·17. 3.
Latitude 38 March Edition: Racing, Cruising, and Profiles
Zprávy

Latitude 38 March Edition: Racing, Cruising, and Profiles

On January 31, 2026, 277 of 303 registered boats sailed out onto San Francisco Bay for the Singlehanded Sailing Society’s (SSS) Three Bridge Fiasco, representing 31 classes including 10 one-design fleets; entries competed doublehanded and singlehanded across PHRF and one-design divisions, putting a spotlight on fleet logistics, crew allocation, and start-line traffic management around the bay’s choke points.

5 min·17. 3.
Blake Oberbauer’s First Year with Dartmouth Sailing
Zprávy

Blake Oberbauer’s First Year with Dartmouth Sailing

Four days of on-water practice each week, regattas most weekends, and early-morning conditioning form the operational backbone of Dartmouth sailing logistics for freshman Blake Oberbauer, who relocated from Tiburon to Hanover and now trains on Mascoma Lake.

6 min·17. 3.
2026–27 Classic Regatta Calendar and Logistics
Zprávy

2026–27 Classic Regatta Calendar and Logistics

Marina capacity and berth allocation across the Solent and Mediterranean will be under acute pressure during peak regatta weeks: berth occupancy often rises by 30–50% in Cowes, Saint-Tropez and Antibes during major events, requiring coordinated arrival windows, pre-booked moorings and advance customs paperwork for non-EU flagged vessels to avoid delays at fuel and provisioning points.

5 min·17. 3.
How to Meet Oregon’s Boating Education Rules
Zprávy

How to Meet Oregon’s Boating Education Rules

Oregon requires a Boating Safety Education Card for anyone operating a motorized vessel with more than 10 horsepower, including personal watercraft (PWC); the mandate applies to both residents and non-residents using Oregon waterways.

5 min·17. 3.
Linjett 36: New Swedish 36-Foot Performance Cruiser
Zprávy

Linjett 36: New Swedish 36-Foot Performance Cruiser

Berthing and transport planners should note that the Linjett 36’s 11m LOA and 3.66m beam, combined with a 1.95m draught (optional 1.8m) and a displacement of 6,800kg, demand marina berths with appropriate depth and a travel-lift or crane capacity rated for at least 7.5 tonnes.

6 min·17. 3.